Here’s the latest information on renovations of campus buildings. These projects have either been recently completed or are still in progress.

Olive Kettering Library
- Repairs to entry platform, stairs, stair platform, planters and wall at north entry
- Exterior brick masonry work
- Rebuilding south walls at buckled area
- Cut in expansion joints
- Relay select areas of brick to blend
Antioch Hall
- West elevation asphalt removal and concrete replacements
- Brick repair and replacement
Antioch Union
- Patch roof leaks
Birch Hall
- Monitoring the effectiveness of roof repairs
Coretta Scott King Center
- Exterior door leaks
- Exterior door repairs on south elevation
Curl Gymnasium Complex
- Roofing repair on South Gym
- Insulate ceiling of pool
- Roof replacement for the flat roof between South three buildings and Curl
- Exterior painting
- First floor stabilization
- Termite and mold remediation
- Structural repairs to the east and west walls of the pool
Fine Arts
- Replace flat roofs
Glen Helen
- Re-mediate roof drainage issues
McGregor Hall
- Stop water intrusion through windows, window sills and coping as well as behind the handicap ramp
- Mold remediation
Mills
- Shell and site core stairs/platform
North Hall
- Exterior brick masonry
- Physical Plant Offices
- Repair damage from roof issues
Rebecca Pennel House
- Porch is being repaired/reinforced
- Exterior and interior walls painted
- Replace carpeting
- Roof and flashing
Science Building
- Shade structures over windows repairs
- Roof flashing at parapet
- Brick masonry repairs at east and west elevators
Sontag-Fels
- Front retaining wall repairs
- Replacement or mudjack walkway at southerly door on east elevation
- Masonry of exterior
- Downspout repairs at collector box and roof leak repairs
Spalt
- Exterior Slabs at Commons Rooms reverse flows toward building
- Concrete slab repair, first floor exteriors
Theater Building
- Roof repairs
Units
- Small repairs to deck, railing and entry doors